Search Constraints
You searched for:
Genre
photographic prints
Remove constraint Genre: photographic prints
Place
Goleta (Calif.)
Remove constraint Place: Goleta (Calif.)
Format
Still Image
Remove constraint Format: Still Image
« Previous |
1 - 100 of 422
|
Next »
Number of results to display per page
Search Results
Select an image to start the slideshow

Aerial view of UCSB site before development of marine base
1 of 100

UCSB site before development (Marine Base)
2 of 100

UCSB site before development (Marine Base)
3 of 100

Aerial view of the Marine Corps Air Station Santa Barbara
4 of 100

UCSB site before development (Marine Base)
5 of 100

UCSB site before development (Marine Base)
6 of 100

UCSB site before development (Marine Base)
7 of 100

Aerial view of Marine Corps Air Station Santa Barbara and surrounding Goleta city
8 of 100

Eleventh naval district, San Diego, Calif. Marine Corps Air Station Santa Barbara, Calif. Grading & Paving Runways & Parking Area
9 of 100

Eleventh naval district, San Diego, Calif. Marine Corps Air Station Santa Barbara, Calif. Grading & Paving Runways & Parking Area
10 of 100

Students outside of residential halls on campus
11 of 100

Library under construction
12 of 100

Library under construction
13 of 100

Drill steamer being awarded to Company D of Santa Barbara College ROTC Battalion
14 of 100

Varsity rifle team on the range
15 of 100

Cadet Sgt. Thad Roberts, right, supervises the drawing of arms by three cadet privates in the armory at Santa Barbara College
16 of 100

Military Science / ROTC
17 of 100

Captain Campbell and Major Robt Evans with unidentified individual at ROTC event
18 of 100

ROTC cadets in uniform
19 of 100

View of the library building under construction
20 of 100

View of the library completed
21 of 100

Library under construction
22 of 100

Library under construction
23 of 100

Placing books on stacks
24 of 100

View of a tree awaiting transplanting
25 of 100

Library under construction
26 of 100

Library under construction
27 of 100

View of the library completed
28 of 100

Library building foundation being constructed
29 of 100

Students standing in front of the entrance of the library
30 of 100

Library under construction
31 of 100

Library building completed
32 of 100

View of the back entrance to the library
33 of 100

Library groundbreaking ceremony
34 of 100

Unit I groundbreaking construction
35 of 100

Visitors and Dr. Mary Erickson looking on as California Gray whales migrating by the Santa Barbara College beach during College Day
36 of 100

Library under construction
37 of 100

View of the library's back entrance
38 of 100

View of the library's front entrance
39 of 100

View of the library's back entrance
40 of 100

Students out on the patio
41 of 100

View of the library's front entrance
42 of 100

Library under construction
43 of 100

View of the library's back entrance
44 of 100

View of the library's back entrance
45 of 100

View of the library's back entrance
46 of 100

Library's back entrance light up in the evening
47 of 100

Students on the second floor patio of the library
48 of 100

View of the library's back entrance
49 of 100

View of the library
50 of 100

Library entrance portico
51 of 100

View of the library entrance with students sitting near by
52 of 100

Students studying outdoors at the library
53 of 100

Students on the second floor patio of the library
54 of 100

View of the library's front entrance
55 of 100

View of the library's back entrance
56 of 100

Students sitting on the patio in front of the library
57 of 100

Students out on the patio
58 of 100

Students sitting on the lawn in front of the library's back entrance
59 of 100

View of the library
60 of 100

Santa Barbara College Library
61 of 100

Library under construction
62 of 100

View of the library's back entrance
63 of 100

College Day, library
64 of 100

View of the library's back entrance
65 of 100

Library's seaward sundeck
66 of 100

View of the library's back entrance
67 of 100

View of the library's front entrance
68 of 100

View of the library's back entrance
69 of 100

Unit I groundbreaking construction
70 of 100

Unit I groundbreaking construction
71 of 100

Library being constructed
72 of 100

Library under construction
73 of 100

Music Building under construction
74 of 100

Music Building under construction
75 of 100

Patio on campus
76 of 100

Researchers working on the beach
77 of 100

A team of students and researchers aboard the Thomas G. Thompson retrieves a suction sampler
78 of 100

Researchers looking at a crustacean
79 of 100

Researcher looking at kelp in a tank in the Marine Science department
80 of 100

Researcher pulling something from a tank in the Marine Science department
81 of 100

Classroom groundbreaking ceremony with Provost Clark G. Kuebler; Robert E. Floyd, University Planning Engineer; Dr. Mortimer Andron, Chairman of the Classroom Building Committee; and Harold Weaver, Superintendent for the contractor
82 of 100

Groundbreaking, Webb Hall
83 of 100

Students carrying a beach seine used to catch marine biology specimens on the campus beach
84 of 100

Students on the lawn near the Library
85 of 100

Students and staff on campus
86 of 100

Science Building - this $1,200,000 building has facilities for the Physical Sciences and Biological Sciences Dept.
87 of 100

Student on campus near the Library
88 of 100

Students walking on campus
89 of 100

Students and staff on campus
90 of 100

SFC James Craig showing a browning machine gun
91 of 100

View of the library
92 of 100

Library book return
93 of 100

Season's Greetings and all good wishes
94 of 100

A view of the library completed
95 of 100

ROTC ceremony
96 of 100

Young man sitting in front of boxes of books awaiting the move to the newly constructed library
97 of 100

SB College Marine Biological research
98 of 100

Award being presented, SB College ROTC
99 of 100

UCSBC Inauguration-Dedication
100 of 100